6 Bank line shift: (a) left bank, (b) right bank of Dharla, and (c)

6 Bank line shift: (a) left bank, (b) right bank of Dharla, and (c)

4.5
(613)
Write Review
More
$ 20.50
Add to Cart
In stock
Description

Assessing the impacts of current and future changes of the planforms of river Brahmaputra on its land use-land cover - ScienceDirect

River bank lines have been prepared for the years 1760s, 1988 and 2014

Earth Surface Processes and Landforms, Geomorphology Journal

Land, Free Full-Text

Assessing the bridge construction effect on river shifting characteristics through geo-spatial lens: A case study on Dharla River, Bangladesh - ScienceDirect

Assessing the bridge construction effect on river shifting characteristics through geo-spatial lens: A case study on Dharla River, Bangladesh - ScienceDirect

A schematic diagram showing how shifting of the riverbanks from 1987 to

6 Bank line shift: (a) left bank, (b) right bank of Dharla, and (c)

Stock market today: Live updates